Faarea Masud
Business reporter, BBC News
PA Media
Issues at an electrical substation which caused a fire that resulted in Heathrow Airport closing were first detected seven years ago but not fixed, a report has found.
The investigation found that National Grid, which owns the substation, had been aware of a fault since 2018.
The report details numerous opportunities to rectify issues at the substation, but found maintenance was repeatedly deferred.
Heathrow shut down as a result of the power cut, which led to thousands of cancelled flights and stranded passengers.
Energy watchdog Ofgem has launched an investigation into National Grid following the report’s findings, which Energy Secretary Ed Miliband called “deeply concerning”.
The National Energy System Operator (Neso) said moisture entering electrical components at the North Hyde substation caused the blaze at the site that supplies the UK’s biggest airport with power.
It said “elevated” moisture had been detected in July 2018 and that under National Grid’s guidance, such readings indicate “an imminent fault and that the bushing should be replaced”.
But it said the issue went “unaddressed” and an “basic maintenance” to fix the problem in 2022 was deferred.
The fire at the electrical substation in 20 March resulted in a major power cut shutting down Heathrow and affecting more than 270,000 journeys. The impact was also felt beyond the airport, with “essential services” including road, rail and Hillingdon Hospital affected, Neso said.
The power failure resulting in the closure of Heathrow has raised wider questions about the UK’s major infrastructure resilience.
‘Missed opportunities’
Fintan Slye, Neso’s chief executive, told the BBC’s Today programme that while the report “did not set out to apportion blame”, National Grid was responsible for the maintenance of the equipment and making sure it is fit for operation.
“So when they identified those moisture levels back in 2018, what should have happened is that the transformer should have been taken out of service for a short period of time and that fault effectively repaired,” he said.
“That was missed. The moisture got worse over time and ultimately that’s what caused the fire to happen. The story of our report really is probably one of missed opportunities.”
After announcing its investigation into National Grid, Akshay Kaul, director general for infrastructure at Ofgem, said it expected energy companies to “properly maintain their equipment and networks to prevent events like this happening”.
“Where there is evidence that they have not, we will take action and hold companies fully to account,” he added.
National Grid said it had a “comprehensive asset inspection and maintenance programme in place” and that it had “taken further action since the fire”.
It said this included “re-testing the resilience of substations that serve strategic infrastructure” and added it would cooperate with Ofgem’s investigation.
Mr Slye said as well as the substation fault, there was also a “potential missed opportunity” at Heathrow to maximise its energy resilience and also another to across the energy industry around understanding resilience of critical infrastructure.
The report also said that “it was not known to the energy companies” that the loss of one of the electrical supply points – of which Heathrow has three – would result in a power outage to some of the airport’s critical systems.
“The review also found that energy network operators are not generally aware whether customers connected to their networks are Critical National Infrastructure,” it said.
Heathrow Airport welcomed the report and said it expected National Grid “to be carefully considering what steps they can take to ensure this isn’t repeated”.
“A combination of outdated regulation, inadequate safety mechanisms, and National Grid’s failure to maintain its infrastructure led to this catastrophic power outage,” the airport said.
Nigel Wicking, chief executive of Heathrow Airline Operators’ Committee, told the BBC that Heathrow’s closure cost airlines between £80m-£100m.